CH- Speicher

Screen Shot 2016-07-08 at 23.50.25.png

Operator:
SAK AG

Consultants:
Hälg & Co. AG

Wood firing system:
6.0 [MW]

Heat recovery:
approx. 1.1 [MW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Expected comm.:
September 2014

Products:
Flue gas condenser, K07
Wet electrostatic precipitator, N07
Water treatment system, W07
Bypass- damper, B04
Big-Bag Handling system, S07        

CH - Murten

Operator:
IB Murten

Wood firing system:
1.6 +3.2 [MW]

Cleaning:
88.9%, 180 mg/Nm3 (11% O2), 20 mg/Nm3 (11% O2)
                
Commissioning
June 2015

Products:
ESP D02 + ESP D03
Operating pressure – 2500 Pa
                

IT- Mals

Operator: 
DH Mals

Wood firing system:
4.2 + 2.0 [MW]

Cleaning: 
89 %, 180 mg/Nm3 (11% O2),  20 mg/Nm3 (11% O2)
                
Commissioning:
10/2015

Products:
ESP D07
Flaps for operation with boiler 1, 2 or in parallel high voltage unit for max. 50 °C
                                

FR- Cernay

Operator: 
Cofely

Wood firing system: 
4.2 [MW]

Heat recovery: 
approx. 800 [KW]

Dust content: 
< 20 [mg/Nm3](at 11 vol-% O2)

Commissioning: 
September 2014

Products:

  • Flue gas condenser, K04
  • Wet electrostatic precipitator, N04
  • Water treatment system, W07
  • Bypass- damper, B04
  • Big-Bag Handlingsystem, S04

CH- Aarburg

Operator: 
Franke Schweiz AG

Consultants: 
Carnotech AG

Wood firing system: 
2.25 [MW]

Heat recovery: 
approx. 750 [KW]

Dust content: 
< 20 [mg/Nm3](at 11 vol-% O2)

Devaporization: 
to -5 [°C]

Commissioning: 
February 2015

Products:

  • Flue gas condenser, K02
  • Wet electrostatic precipitator, N02
  • Water treatment system, W07
  • Bypass- damper, B02
  • Big-Bag Handlingsystem, S04
  • Devaporisor, E02

SE- Sorsele

Operator: 
Gemeinde Sorsele

Consultants: 
Hotab Bio Energy AB

Wood firing system: 
5.5 [MW]

Heat recovery: 
approx. 750 [KW]

Commissioning: 
October 2014

Products:

  • Flue gas condenser, K07
  • Water treatment system, W07
  • Big-Bag Handlingsystem, S04

CH- Waser

Operator: 
Stadtwerk Winterthur

Consultants: 
Müller & Pletscher AG

Wood firing system: 
4.1 [MW]

Heat recovery: 
approx. 600 [KW]

Dust content: 
< 20 [mg/Nm3](at 11 vol-% O2)

Commissioning: 
August 2015

Products:

  • Flue gas condenser, K04
  • Wet electrostatic precipitator, N04
  • Water treatment system, W07
  • Bypass- damper, B02
  • Big-Bag Handlingsystem, S04

CH- Huttwil

Operator: 
Renercon Anlagen AG

Consultants: 
Renercon Anlagen AG

Wood firing system: 
4.1 [MW]

Heat recovery : 
approx. 600 [KW]

Dust content: 
< 20 [mg/Nm3](at 11 vol-% O2)

Devaporization: 
to -5 [°C]

Commissioning: 
February 2015

Products:

  • Flue gas condenser, K04
  • Wet electrostatic precipitator, N07
  • Water treatment system, W07
  • Big-Bag Handlingsystem, S07
  • Devaporisor, E04

CH- Regensdorf

Operator: 
Aecherli Holz AG

Wood firing system: 
3.6 [MW] (planned upgrade to 5.0 [MW])

Dust content: 
< 20 [mg/Nm3](at 11 vol-% O2)

Commissioning: 
March 2014

Products:

  • ESP D03 special with 3 chambers
  • duct work

CH- Broc

General Contractor: 
EBL

Operator: 
Village de Broc

Wood firing system: 
2.5 [MW]

Cleaning: 
180 [mg/Nm3](at 11 vol-% O2)  to20 [mg/Nm3](at 11 vol-% O2)

Commissioning: 
February 2015

Products:

  • ESP D03

CH- Losone

Operator: 
ERL Energia Rinovabili Losone SA

Wood firing system: 
3.6 [MW]

Cleaning: 
180 [mg/Nm3](at 11 vol-% O2)  to20 [mg/Nm3](at 11 vol-% O2)

Commissioning: 
May 2015

Products:

  • ESP D03